Kumamoto Washington Hotel Plaza
Updating the Hotel's Value of Stay
Through Room Renewals and New Spa Facilities.
This is the guest room renewal and spa facility construction project for Kumamoto Washington Hotel Plaza.
Centered on a seamless flow design connecting the front desk to the spa facilities, ANDas comprehensively handled everything from the lobby to the guest rooms—covering design planning, design services, equipment works, FF&E, and signage works in an end-to-end process.
The biggest key to this project was the challenge of "constructing new spa facilities" within a limited timeframe. We restructured the schedule and formulated a unique construction plan that effectively incorporated night work. Without compromising quality in the slightest, we achieved completion exactly on schedule.
Through our reliable techniques, we materialized a "valuable space" that simultaneously elevates operational efficiency and guest satisfaction.
Overview
- Project Name
- Kumamoto Washington Hotel Plaza
- Location
- 2-3-10 Shimotori, Chuo-ku, Kumamoto City, Kumamoto
- Category
- Hotel
- Scope
- Design Planning, Design Services, Interior Construction, Electrical Equipment Work, Mechanical Equipment Work, Signage Works, FF&E (Furniture Work)
- Areas
- Guest Rooms, Lobby, Spa Facilities
- Duration
- October 2023 – October 2024
- Contract Type
- Main Contractor